吉泽明步伦理片_国产黄色av_中文字幕人妻无码一夲道蜜桃_白丝校花在我腿上呻吟jk

Language:CHINESESENGLISH

Home > News > FAQs
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.medcpap.com
On the fireproof paint fireproof principles and techniques
On the fireproof paint fireproof principles and techniques     Abstract steel as the main form of modern architecture, light weight, high strength, good seismic performance, short construction period, the high degree of industria...
2015/3/14
Engineering Technology: steel construction machinery and equipment General Provisions
Engineering Technology: steel construction machinery and equipment General Provisions 1, various types of construction machinery and steel construction used should be consistent with the current industry standard "construction machinery safety techn...
2015/1/24
Structural design knowledge: Multilayer Steel plant layout which provisions?
Structural design knowledge: Multilayer Steel plant layout which provisions? What Multilayer Steel plant layout requirements?A planar complex shape, the various parts of the framework of the large difference in height or floor loads differ markedly,...
2015/1/24
Engineering Technology: Structural steel construction and cable-membrane material control on the quality of the membrane surface
Engineering Technology: Structural steel construction and cable-membrane material control on the quality of the membrane surface [Student] problems and long-span cable-membrane structure steel construction on the membrane surface material quality co...
2015/1/24
Engineering Technology: General requirements for inspection of steel structure engineering foundation
Engineering Technology: General requirements for inspection of steel structure engineering foundation      Steel installation before positioning axis response, infrastructure and elevation axes, bolt size and location of the buil...
2015/1/14
The reason steel corrosion paint is widely used analytical
The reason steel corrosion paint is widely used analytical      Steel paint matching program varied, according to the use of the environment and age, decide what kind of paint matching, and now the market fluorocarbon best corros...
2014/12/31
Steel construction design FAQ encounter
Steel construction design FAQ encounter     First, if you have gutters, tie rod can not be designed to close to the capitals of the site, otherwise it may lead to the installation downspouts. Another gutter downspouts and Tied a...
2014/12/6
Steel Works How to use
Steel Works How to use "plastic doors and windows." In recent years, steel doors and thrive, the first research center is inseparable from China Steel Forum refer to the new technologies, new ideas, accumulated over the years of concern and support,...
2014/11/29
Advantages and strength of steel structures
    Of course the larger the weight of the steel, but the strength was high more, compared with the weight of other structures, much less than the weight of the steel structure other structures. In the opposite load conditions, wh...
2014/11/29
Lap portion of the roof repair rust rot
Lap portion of the roof repair rust rot Foshan Steel repair process: 1, use special scissors to sort interfaces 2, laying new tiles from scratch, plus the length of> 40 cm above and below the interface site 3, use self-tapping screws and riv...
2014/9/13
How to avoid space H-beam steel structure plant variants
How to avoid space H-beam steel structure plant variants      H-beam space Foshan Steel plant diversity change, fully embodies the planners planning concepts, but the construction workers who have infinite test. However, there i...
2014/9/13
Technical preparation of steel structure device
Technical preparation of steel structure device Technical preparation Foshan Steel unit mainly includes the following points: ① should strengthen the close conjunction with planning units. Careful review of the drawings, the intent and understa...
2014/9/6
page:12  1  2  3  4  5  6  7  8  9  10  11  12  13  14  pervious next  

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號