吉泽明步伦理片_国产黄色av_中文字幕人妻无码一夲道蜜桃_白丝校花在我腿上呻吟jk

Language:CHINESESENGLISH

Home > News > Elevated Rail Station largest domestic steel cable-membrane canopy project is completed
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.medcpap.com

Elevated Rail Station largest domestic steel cable-membrane canopy project is completed

Time:[2014-11-15]  Hits:5329

     At present, the elevated rail transit stations in the largest steel cable film project - Shanghai Rail Transit Line 11 # Longyang Road elevated station south section steel canopy project, recently China Railway Construction Steel Company completed four innings. The canopy total length 244 m, span 41.2m, building area 12668㎡ for steel arch + cable-membrane structure. For all-welded steel structure, with steel arches + mast cable-stayed system, a total of four cables to the mast, three cable-stayed mast and the main arch connecting with the main arch and two adjacent sub-arches. A total of nine specimens of the main roof structure arch, 8 Pin Vice arch, arch between the main arch deputy by the curved trusses connecting rods and vertical connection contact. Roofing material selection PTFE (opaque waterproof membrane) and ETFE (transparent) of two membranes with the use of both natural lighting, shelter and many other features, beautiful and practical.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)