吉泽明步伦理片_国产黄色av_中文字幕人妻无码一夲道蜜桃_白丝校花在我腿上呻吟jk

Language:CHINESESENGLISH

Home > News > Foshan Steel: Steel truss installation procedures and order and precautions
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.medcpap.com

Foshan Steel: Steel truss installation procedures and order and precautions

Time:[2014-12-20]  Hits:5091

Foshan Steel: Steel truss installation procedures and order and precautions

Truss installation method and scope as follows:
1) High Altitude in Bulk: for all types of nodes connected grid, and should adopt the cantilever construction method less bracket;
2) sub-section or sub-block installation method: for stiffness and force status changed after the split in smaller grid, such as the two orthogonal Pyramid, forward evacuated square pyramid and other grids. Striping or block size should be based on the lifting capacity;
3) Overhead Sliding law: for Pyramid, being put PYRAMIDIC evacuated, two orthogonal Pyramid and other grids. Slip sliding unit should ensure become geometric invariant system;
4) Overall lifting method: for all types of grid, pan or rotate when lifting can place high in the sky;
5) enhancing the overall law: for peripheral support and multi-point support grid, available l plate machine, hydraulic jacks and other small machines for construction;
6) The overall lifting law: for multi-point fulcrum less support grid.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)