吉泽明步伦理片_国产黄色av_中文字幕人妻无码一夲道蜜桃_白丝校花在我腿上呻吟jk

Language:CHINESESENGLISH

Home > News > China's first steel elevator test tower into operation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.medcpap.com

China's first steel elevator test tower into operation

Time:[2015-9-19]  Hits:4926

Guangzhou Steel News: China's first steel elevator test tower into operation


Yellow River Delta's first elevator tower experiment recently successfully put into operation Construction Siegel elevator factory. It is reported that this is the first domestic steel building elevator test tower way to build the tower to fill the domestic high-speed elevator safety components certified progressive safety gear blank.
The experiment Tata 70 meters high, in addition to the elevator for type experiment machine and elevator safety components and key components of the rated speed 6 meters per second, the rated load 1600 kg or less elevator machine type of experiment and research outside, It can also be progressive safety gear, the upstream part of the experiment overspeed protection devices.
According to succeed Construction Siegel elevator factory director Wang Hui, built the tower extends the scope of manufacturing operations, will Traction elevator passenger elevator from the previous maximum speed was raised to four meters per second per second 2.5 Métis. Earlier, in Shandong province, with only one in this capacity. Experimental tower adds no room elevators, sightseeing elevators and bed elevators three kinds ladder, its remote monitoring system placed in the elevator on the actual operation of the tower. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)