吉泽明步伦理片_国产黄色av_中文字幕人妻无码一夲道蜜桃_白丝校花在我腿上呻吟jk

Language:CHINESESENGLISH

Homepage > Product > Congo steel plant
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy
  • URL:http://m.medcpap.com

Congo steel plant

Congo steel plant

 

 

Congo Steel structure workshop project

1.Engineering cases:

 

 

2.steel structure workshop
  Steel structure workshop is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss (of course the span of plant is bigger, basic is the prefabricated steel structure truss now), steel roof, pay attention to the wall of the steel structure maintenance also can use brick wall.
1. Features: fast and flexible to assemble, safe, thermal and noise insulation, water proof and fire prevention

 

3.Commonly used steel materials and the performance of the steel:

1) carbon structural steel: Q235B, Q345B, etc.

2) high strength low alloy structural steel;

3) high quality carbon structural steel;

4) alloy structural steel special steel;

5) special purpose steel;

6) walls and roofing material is optional: corrugated steel plate, EPS sandwich panel, rock wool sandwich panel and polyurethane sandwich panel

 

4.Guidance installation

  Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
Customer should provide:
   1) Translator or assistant on site.
   2) All costs raised including: 
    A. visa fee
    B. Round trip flight ticket
    C. Accident insurance for the supervisor during the period
    D. Accommodation
    E. Daily meals
    F. Internet
    G. Local traffic fee (if any)
   3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
   4) Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
There have some guidance installation picture:

5.Contact way

1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
3)Foshan, Guangdong Province, China
4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682

Hits:15029 Time:[2020-2-26]

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號